Article ID Journal Published Year Pages File Type
481588 European Journal of Operational Research 2008 22 Pages PDF
Abstract

This paper considers two single-machine scheduling problems with outsourcing allowed where each job can be either processed on an in-house single-machine or outsourced. They include the problem of minimizing maximum lateness and outsourcing costs, and that of minimizing total tardiness and outsourcing costs. Outsourcing is commonly required as a way to improve productivity in various companies including electronics industries and motor industries. The objective is to minimize the weighted sum of the outsourcing cost and the scheduling measure represented by either one of maximum lateness and total tardiness, subject to outsourcing budget. It is proved that the problem is NP-hard. Some solution properties are characterized to derive heuristic algorithms, and also a branch-and-bound algorithm. Numerical experiments are conducted to evaluate performance of the derived algorithms.

Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,