Abstract
This paper proposes a heuristic multi-phase approach to minimize the moving distance of gantries by balancing the workload of a dual-delivery surface mount technology (SMT) placement machine. The SMT placement machine under study is a rotary-head dual-gantry machine. Several practical factors are considered, such as the component-nozzle compatibility and the machine structure. The machine has two stations with a symmetric layout. Each station has a printed circuit board (PCB) conveyor belt, a fixed camera, an auto nozzle changer, a feeder base, and a movable gantry with several nozzle heads. In the pick-and-place assembly operation, two independent gantries alternately mount on one PCB. Most research in literature considers three main decisions in the SMT placement machine optimization: nozzle setup, feeder arrangement, and pick-and-place sequence. In this research, two more decisions are introduced into the dual-gantry problem: workload balance between gantries and gantry cycle scheduling. A hierarchical strategy is developed to solve the workload balance problem, including nozzle and component allocations. The other decisions, such as the feeder arrangement and the pick-and-place sequence, are made using existing heuristics. The experimental results show that this heuristic approach has advantages compared to other algorithms proposed in literature.
Related Topics
Physical Sciences and Engineering Computer Science Artificial Intelligence
Authors
, , ,