Article ID Journal Published Year Pages File Type
4959922 European Journal of Operational Research 2017 33 Pages PDF
Abstract
The goal of this paper is to introduce facility capacities into the Reliability Fixed-Charge Location Problem in a sensible way. To this end, we develop and compare different models, which represent a tradeoff between the extreme models currently available in the literature, where a priori assignments are either fixed, or can be fully modified after failures occur. In a series of computational experiments we analyze the obtained solutions and study the price of introducing capacity constraints according to the alternative models both, in terms of computational burden and of solution cost.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, , , ,