Article ID Journal Published Year Pages File Type
4959954 European Journal of Operational Research 2017 11 Pages PDF
Abstract
In this paper the approximability of parallel machine scheduling problems with resource consuming jobs is studied. In these problems, in addition to a parallel machine environment, there are non-renewable resources, like raw materials, energy, or money, consumed by the jobs. Each resource has an initial stock, and some additional supplies at a-priori known moments in time and in known quantities. The schedules must respect the resource constraints as well. The optimization objective is either the makespan, or the maximum lateness. Polynomial time approximation schemes are provided under various assumptions, and it is shown that the makespan minimization problem is APX-complete if the number of machines is part of the input even if there are only two resources.
Related Topics
Physical Sciences and Engineering Computer Science Computer Science (General)
Authors
, ,