Article ID Journal Published Year Pages File Type
6683446 Applied Energy 2016 16 Pages PDF
Abstract
The RD 413/2014 new economic and regulatory framework for producers of electricity from renewable energy sources in Spain has been here analysed, putting the focus on its impact on the economic results of the existing grid connected PV systems. A complete formulation of the new remuneration scheme is first presented, making evident its high complexity and the great number of regulatory parameters involved. Then, in order to facilitate the discernment of its operating mechanism a simplified model is proposed. This approach has proven to be a useful tool to identify the most influential regulatory parameters and also which could be the plausible future regulatory actions in order to contain the cost to the Spanish Electricity System. Finally, the NPV and the IRR among other indicators are calculated for a representative case study facility, evidencing a substantial profitability reduction in the transition from the former economic and regulatory framework to the RD 413/2014 new remuneration scheme.
Related Topics
Physical Sciences and Engineering Energy Energy Engineering and Power Technology
Authors
, , , , ,