کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1057169 947063 2011 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Evaluation of environmental management resources (ISO 14001) at civil engineering construction worksites: A case study of the community of Madrid
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
پیش نمایش صفحه اول مقاله
Evaluation of environmental management resources (ISO 14001) at civil engineering construction worksites: A case study of the community of Madrid
چکیده انگلیسی

In recent years, significant advances have been made in business organization and management. The growing demands of clients as well as the globalization of world markets are among the many factors that have led to the establishment of systems of quality control and environmental management as a competitive strategy for businesses.When compared to other professional sectors, the construction sector has been slower to respond to environmental problems and to adopt Environmental Management Systems (EMS). In the world today the ISO 14001 standard is currently the main frame of reference used by construction companies to implement this type of management system.This article presents the results of a general study regarding the evaluation of the application of the ISO 14001 standard at civil engineering construction worksites in the Community of Madrid (Spain), specifically pertaining to requirement 4.4.1, Resources, roles, responsibilities, and authority.According to requirement 4.4.1, company executives should appoint people responsible for implementing the EMS and also specify their responsibilities and functions. The personnel designated for supervising environmental work should also have sufficient authority to establish and maintain the EMS.The results obtained were the following:-EMS supervisors did not generally possess adequate training and solid experience in construction work and in the environment. Furthermore, supervisors were usually forced to combine their environmental work with other tasks, which made their job even more difficult.-Generally speaking, supervisors were not given sufficient authority and autonomy because productivity at the construction site had priority over environmental management. This was due to the fact that the company management did not have a respectful attitude toward the environment, nor was the management actively involved in the establishment of the EMS.-Insufficient resources were allocated to the Environmental Management Unit.As a result, the application of EMSs in construction projects often appeared to be more of a formality, which was merely a way of maintaining the certification of the Environmental Management System. It was more a means of meeting the requirements for submitting a tender to contracting organisms rather than an indicator of any real commitment to improving the environmental performance of construction companies.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Environmental Management - Volume 92, Issue 7, July 2011, Pages 1858–1866
نویسندگان
, , ,