کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1134973 956084 2012 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Integrated pulp and paper mill planning and scheduling
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Integrated pulp and paper mill planning and scheduling
چکیده انگلیسی

This article describes a real-world production planning and scheduling problem occurring at an integrated pulp and paper mill (P&P) which manufactures paper for cardboard out of produced pulp. During the cooking of wood chips in the digester, two by-products are produced: the pulp itself (virgin fibers) and the waste stream known as black liquor. The former is then mixed with recycled fibers and processed in a paper machine. Here, due to significant sequence-dependent setups in paper type changeovers, sizing and sequencing of lots have to be made simultaneously in order to efficiently use capacity. The latter is converted into electrical energy using a set of evaporators, recovery boilers and counter-pressure turbines. The planning challenge is then to synchronize the material flow as it moves through the pulp and paper mills, and energy plant, maximizing customer demand (as backlogging is allowed), and minimizing operation costs. Due to the intensive capital feature of P&P, the output of the digester must be maximized. As the production bottleneck is not fixed, to tackle this problem we propose a new model that integrates the critical production units associated to the pulp and paper mills, and energy plant for the first time. Simple stochastic mixed integer programming based local search heuristics are developed to obtain good feasible solutions for the problem. The benefits of integrating the three stages are discussed. The proposed approaches are tested on real-world data. Our work may help P&P companies to increase their competitiveness and reactiveness in dealing with demand pattern oscillations.


► Production planning and scheduling problem at an integrated pulp and paper mill.
► We model the problem as a synchronized multi-stage lotsizing and scheduling.
► MIP-based local search improvement heuristic is implemented to solve the model.
► Benefits of integrating the pulp and paper production and energy plant are discussed.
► Model and algorithm tested on real-world data from a case-study.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 63, Issue 1, August 2012, Pages 1–12
نویسندگان
, ,