کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1135446 956100 2008 16 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Heuristics for an industrial car sequencing problem considering paint and assembly shop objectives
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Heuristics for an industrial car sequencing problem considering paint and assembly shop objectives
چکیده انگلیسی

The aim of this paper is to study the problem of sequencing a set of vehicles within an industrial environment considering the assembly shop objectives, but also the objectives of the paint shop. The first approach is to solve the problem with a mono-objective function. One heuristic (a progressive, construction-sequence algorithm) and three meta-heuristics (simulated annealing, variable neighbourhood search and an evolutionary algorithm) are described and compared. As the mono-objective approach has limited possibilities, a multi-objective heuristic is finally presented and tested. Because of the industrial context of this research, the computation time is a decisive factor to select the appropriate heuristic.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Industrial Engineering - Volume 55, Issue 2, September 2008, Pages 295–310
نویسندگان
, ,