کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1514979 | 1511229 | 2011 | 6 صفحه PDF | دانلود رایگان |
The COCS (Cost Saving CO2 Capture System) Project had been carried out by RITE in collaboration with four Japanese companies from April 2004 to March 2009. It was the R&D project to reduce CO2 capture cost by half compared to the cost of a conventional technology for CO2 removal from a blast furnace gas in an integrated steel works. One of the main research issues in this project was to develop a novel absorbent which could be regenerated with a low thermal energy. RITE especially led the development of new absorbents. Initially amine solvents were investigated through laboratory-scale experiments, and then some selected solvents were evaluated at the 1t-CO2/d test plant. RITE successfully developed innovative amine absorbents, which have high absorption rate and low desorption energy of about 2.5–2.65 GJ/t-CO2 for CO2 capture from a blast furnace gas.
Journal: Energy Procedia - Volume 4, 2011, Pages 253-258