کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1734991 1016169 2010 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Warm season cooling requirements for passive buildings in Southeastern Europe (Romania)
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Warm season cooling requirements for passive buildings in Southeastern Europe (Romania)
چکیده انگلیسی

The first Romanian passive office building has been constructed by the AMVIC Company in Bragadiru, 10 km south of Bucharest. The overheating rate and the cooling load are higher for a passive building than for a standard building. The internal heat sources and the maximum allowed indoor temperature do markedly affect the cooling load. A time-dependent model shows that cooling is necessary during April-September. The ground heat exchanger is an effective system for cooling-down the fresh air inlet temperature. Also, the Venetian blinds prove to be efficient in diminishing the building heat input. However, these two systems are not able to ensure a controlled thermal comfort during summer. This suggests that an active cooling system should be used when passive buildings are implemented in the Romanian climate. The standard configuration of the passive buildings ventilation system (which is usually designed for heating purposes), must be changed in case cooling becomes necessary during the warm season. The results are of interest for other countries in Southeastern Europe.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy - Volume 35, Issue 8, August 2010, Pages 3284–3300
نویسندگان
, , ,