Production and installation study of the ITER PF4 in-pit feeder
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Production and installation study of the ITER PF4 in-pit feeder
چکیده انگلیسی


• Explosive bonding is used to connect the OFE copper with steel box.
• During production process, alignment method is applied to ensure the precision relative positions of the busbar joints.
• The assembly sequence of the PF4 in-pit feeder is developed with minimum clearance of 31 mm.
• Copper shims are used to compensate the gap between busbar joints.

The PF4 in-pit feeder includes the In-Cryostat-Feeder (ICF) and Cryostat-Feed-Through (CFT), with busbars being their key components. The relative positions of the busbar terminal joints are measured by using a laser tracker and adjusted by positioning tools. The busbars are not fixed on the separate plate until the position errors meet the manufacture tolerances. The CFT has a 2.38° penetration angle relative to the ground and will be installed firstly. The position of the connection interface between the CFT and its lifting tool is analyzed, and to reduce the total deformation and keep the assembly precision of the joints the straight part of the CFT needs to be supported. The ICF has the most critical assembly operation space, as it must be installed on its temporary support in a temporary position. After the PF4 coil has been installed the ICF will be moved to its final position. To guarantee the 30 mm safety assembly clearance provided by ITER, the collision analysis of the ICF is performed, which demonstrates that the assembly procedures are feasible.