کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
298193 511778 2010 5 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Tube failures due to cooling process problem and foreign materials in power plants
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Tube failures due to cooling process problem and foreign materials in power plants
چکیده انگلیسی

Cooling process which uses water for heat transfer is an essential factor in coal-fired and nuclear plants. Loss of cooling upset can force the plants to shut down. In particular, this paper reports visual inspections and metallurgical examinations on the failed SA210-A1 right-hand side (RHS) water wall tube of a coal-fired plant. The water wall tube showed the abnormal outer surface colour and has failed with wide-open ductile rupture and thin edges indicating typical signs of short-term overheating. Metallurgical examinations confirmed the failed tube experiencing higher temperature operation. Water flow starvation due to restriction inside the upstream tube is identified as the main root cause of failure. The findings are important to take failure mitigation actions in the future operation. Discussion on the typical problems related to the cooling process in nuclear power plants is also presented.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 240, Issue 7, July 2010, Pages 1882–1886
نویسندگان
, , ,