کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
298194 511778 2010 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Main control system verification and validation of NPP digital I&C system based on engineering simulator
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Main control system verification and validation of NPP digital I&C system based on engineering simulator
چکیده انگلیسی

Full-scope digital instrumentation and controls system (I&C) technique is being introduced in Chinese new constructed Nuclear Power Plant (NPP), which mainly includes three parts: control system, reactor protection system and engineered safety feature actuation system. For example, SIEMENS TELEPERM XP and XS distributed control system (DCS) have been used in Ling Ao Phase II NPP, which is located in Guangdong province, China. This is the first NPP project in China that Chinese engineers are fully responsible for all the configuration of actual analog and logic diagram, although experience in NPP full-scope digital I&C is very limited. For the safety, it has to be made sure that configuration is right and control functions can be accomplished before the phase of real plant testing on reactor. Therefore, primary verification and validation (V&V) of I&C needs to be carried out. Except the common and basic way, i.e. checking the diagram configuration one by one according to original design, NPP engineering simulator is applied as another effective approach of V&V. For this purpose, a virtual NPP thermal-hydraulic model is established as a basis according to Ling Ao Phase II NPP design, and the NPP simulation tools can provide plant operation parameters to DCS, accept control signal from I&C and give response. During the test, one set of data acquisition equipments are used to build a connection between the engineering simulator (software) and SIEMENS DCS I/O cabinet (hardware). In this emulation, original diagram configuration in DCS and field hardware structures are kept unchanged. In this way, firstly judging whether there are some problems by observing the input and output of DCS without knowing the internal configuration. Then secondly, problems can be found and corrected by understanding and checking the exact and complex configuration in detail. At last, the correctness and functionality of the control system are verified. This method is also very convenient for expansion to other type digital I&C V&V. This paper is mainly focused on V&V of closed-loop control systems in full-scope DCS and several detailed reactor control (RRC) systems, including pressurizer pressure and water level control, steam generator water level control. The V&V works were carried out by applying engineering simulator. This paper describes the structure and function of the simulator, V&V procedure, results analysis and problems identified. Through the actual on-line virtual closed-loop testing on Ling Ao Phase II NPP project, many problems of DCS configuration were found and solved. And it proved that V&V based on engineering simulator enables significant time saving, improves economics and safety in the phase of engineering debugging.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Nuclear Engineering and Design - Volume 240, Issue 7, July 2010, Pages 1887–1896
نویسندگان
, , , , ,