کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
303171 512589 2006 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Performance of a 500 kWP grid connected photovoltaic system at Mae Hong Son Province, Thailand
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی های تجدید پذیر، توسعه پایدار و محیط زیست
پیش نمایش صفحه اول مقاله
Performance of a 500 kWP grid connected photovoltaic system at Mae Hong Son Province, Thailand
چکیده انگلیسی

This paper summarises the first eight months of monitoring of the PHA BONG photovoltaic generation project, a 500 kWp photovoltaic pilot plant, in Mae Hong Son province, Thailand. The local grid in this remote area in the North West of Thailand is very limited in its capacity and cannot be enlarged. It has been in operation since 20 March 2004 by feeding into 400 VAC, 22 kV medium voltage grid. The system consist of a photovoltaic array 1680 modules (140 strings, 12 modules/string; 300 W/module), power conditioning units and battery converter system. During the first eight months of this system's operation, the PV system generated about 383,274 kWh. The average of generating electricity production per day was 1695.9 kWh. It ranged from 1452.3 to 2042.3 kWh. The efficiency of the PV array system ranged from 9 to 12%. The efficiency of the power conditioning units (PCU) is in the range from 92 to 98%. The final yield (YF) ranged from 2.91 to 3.98 h/d and the performance ratio (PR) range from 0.7 to 0.9.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Renewable Energy - Volume 31, Issue 1, January 2006, Pages 19–28
نویسندگان
, , ,