کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4769224 1425775 2017 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Application of a Shewhart control chart to monitor clean ash during coal preparation
موضوعات مرتبط
مهندسی و علوم پایه مهندسی شیمی مهندسی شیمی (عمومی)
پیش نمایش صفحه اول مقاله
Application of a Shewhart control chart to monitor clean ash during coal preparation
چکیده انگلیسی


- A research on structuring a Shewhart control chart for clean coal ash content was proposed.
- Three types of process variability of clean ash during the coal preparation process were proposed.
- The effects of ash analyser error and time series autocorrelation were considered before constructing an ash control chart.
- The estimation method of the control chart parameters for monitoring clean ash was presented.
- An application of the control chart with the given standard values in the coal preparation process was presented.

In coal preparation, clean coal ash content is a key indicator for evaluating the quality of clean coal. Online ash analysers are employed to rapidly measure the clean ash, and the resulting measurements are monitored for productive process control. However, the ash observations often fluctuate and are disorganized due to random errors and analyser measurement errors, local variations in coal flow, and changing equipment and processes. Thus, this paper attempts to use the Shewhart control chart method to monitor clean ash in a statistical and global manner. From investigations of the coal preparation process, three types of variability can occur in ash process data: random variability, special variability and systemic variability. An effective X−-Shewhart control chart can detect all abnormal variations under the condition that the control chart parameters (subgroup and control limits) are properly determined. To achieve this, an error analysis of an ash analyser and the influence of data autocorrelation were considered before structuring a clean ash control chart. In phase I, a preliminary dataset was collected from actual ash observations. After an autocorrelation analysis, which excluded abnormal variations, a sampling scheme comparison and the selection of a population standard deviation for the preliminary data, the control chart parameters were precisely estimated. In phase II, the phase I analysis procedure was broadly used to structure a X− chart with given standard values for monitoring clean ash. Therefore, an application example is presented, and the results are discussed to demonstrate the positive impact of this method on a coal preparation plant.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Mineral Processing - Volume 158, 10 January 2017, Pages 45-54
نویسندگان
, , ,