کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
477277 1446147 2009 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
On optimal batch sizing in a multi-stage production system with rework consideration
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
On optimal batch sizing in a multi-stage production system with rework consideration
چکیده انگلیسی

Recently, Sarker et al. [Sarker, B.R., Jamal, A.M.M., Mondal, S., 2008. Optimal batch sizing in a multi-stage production system with rework consideration. European Journal of Operational Research 184(3) 915–929] presented an EPQ inventory model for a multi-stage manufacturing system with rework process; basically they proposed two operational inventory policies. In the paper, there are some mathematical expressions which are to be corrected. At first, this paper presents the mathematical expressions corrected and the appropriate solution to the numerical example. We also established the closed forms for the optimal total inventory cost, the conditions for which there is an optimal solution, and the mathematical expressions for determining the total additional cost for working with a non optimal solution for both policies that were not given by Sarker et al. (2008).

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 196, Issue 3, 1 August 2009, Pages 1238–1244
نویسندگان
,