کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
477860 1446215 2006 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problems
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
A branch and bound algorithm to minimize the total tardiness for m-machine permutation flowshop problems
چکیده انگلیسی

The m-machine permutation flowshop problem with the total tardiness objective is a common scheduling problem, which is known to be NP-hard. Here, we develop a branch and bound algorithm to solve this problem. Our algorithm incorporates a machine-based lower bound and a dominance test for pruning nodes. We undertake a numerical study that evaluates our algorithm and compares it with the best alternative existing algorithm. Extensive computational experiments indicate that our algorithm performs better and can handle test problems with n ⩽ 20.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 174, Issue 1, 1 October 2006, Pages 1–10
نویسندگان
, , ,