کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
478831 1446167 2008 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Investment timing and optimal capacity choice for small hydropower projects
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Investment timing and optimal capacity choice for small hydropower projects
چکیده انگلیسی

This paper presents a method for assessing small hydropower projects that are subject to uncertain electricity prices. We present a real options-based method with continuous scaling, and we find that there is a unique price limit for initiating the project. If the current electricity price is below this limit it is never optimal to invest, but above this limit investment is made according to the function for optimal size. The connection between the real option and the physical properties of a small hydropower plant is dealt with using a spreadsheet model that performs a technical simulation of the production in a plant, based on all the important choices for such a plant. The main results of the spreadsheet are simulated production size and the investment costs, which are in turn used for finding the value of the real option and the price limit. The method is illustrated on three different Norwegian small hydropower projects.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 190, Issue 1, 1 October 2008, Pages 255–267
نویسندگان
, , , , ,