A buffer control method for top-down project control
ترجمه فارسی عنوان
یک روش کنترل بافر برای کنترل پروژه از بالا به پایین
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
چکیده انگلیسی
In this paper, a new buffer monitoring approach is introduced, which sets tolerance limits for Earned Value Management/Earned Schedule (EVM/ES) schedule performance metrics by allocating the project buffer over the different project phases. The purpose of these tolerance limits is to provide the project manager with accurate and reliable information on the expected project outcome during the project execution. A computational study is carried out to assess the performance of the proposed approach and to compare its performance with traditional buffer consumption monitoring procedures. Additionally, existing performance metrics for tolerance limits have been put into a hypothesis testing framework, and new metrics have been developed in order to fill the detected gaps in performance measurement. Results have shown that the proposed tolerance limits improve the performance of the monitoring phase, especially for parallel projects. Consequently, the underperformance of EVM/ES for parallel projects is mitigated by these limits.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 262, Issue 1, 1 October 2017, Pages 274-286
نویسندگان
, ,