کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
5082496 1477633 2008 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Production planning and scheduling in the glass container industry: A VNS approach
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Production planning and scheduling in the glass container industry: A VNS approach
چکیده انگلیسی

Inspired by a case study, this paper reports a successful application of VNS to the production planning and scheduling problem that arises in the glass container industry. This is a multi-facility production system, where each facility has a set of furnaces where the glass paste is produced in order to meet the demand, being afterwards distributed to a set of parallel molding machines. Since the neighborhoods used are not nested, they are not ordered by increasing sizes, but by means of a new empirical measure to assess the distance between any two solutions. Neighborhood sizes decrease significantly throughout the search thus suggesting the use of a scheme in which efficiency is placed over effectiveness in a first step, and the opposite in a second step. We test this variant as well as other two with a real-world problem instance from our case study.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Production Economics - Volume 114, Issue 1, July 2008, Pages 363-375
نویسندگان
, , ,