کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
705288 891315 2008 11 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Analysis of a yearly multi-round, multi-period, multi-product transmission rights auction
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Analysis of a yearly multi-round, multi-period, multi-product transmission rights auction
چکیده انگلیسی

A yearly multi-round, multi-period, multi-product transmission rights (TR) auction issuing both point-to-point Financial Transmission Rights (FTRs) and Flow-Gate Rights (FGRs) is studied in this paper. In each round the TR market participants (buyers or sellers) submit their bid or offer prices based on past energy market performance. A Locational Marginal Pricing (LMP) based energy market is assumed. The TR market participants’ bid or offer prices reflect their expectation of the average annual LMP differences between withdrawal and injections points for FTRs and of the transmission link capacity prices for FGRs. The TR auction is performed in four rounds; in each round 25% of the entire system capability is awarded. TRs that are awarded in one round are modeled as fixed injections in subsequent rounds. Market participants that have acquired TRs in one round can sell them in subsequent rounds. A market participant can submit bids or offers for on-peak, off-peak or 24-h TRs. A three-area, nine-bus test system with six TR market participants is used for the analysis of the TR auction.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electric Power Systems Research - Volume 78, Issue 3, March 2008, Pages 464–474
نویسندگان
, ,