کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
807997 | 905655 | 2012 | 11 صفحه PDF | دانلود رایگان |
An individual method cannot build either a realistic forecasting model or a risk assessment process in the worksites, and future perspectives should focus on the combined forecasting/estimation approach. The main purpose of this paper is to gain insight into a risk prediction and estimation methodological framework, using the combination of three different methods, including the proportional quantitative-risk-assessment technique (PRAT), the time-series stochastic process (TSP), and the method of estimating the societal-risk (SRE) by F–N curves. In order to prove the usefulness of the combined usage of stochastic and quantitative risk assessment methods, an application on an electric power provider industry is presented to, using empirical data.
Journal: Reliability Engineering & System Safety - Volume 97, Issue 1, January 2012, Pages 36–46