کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1006346 938247 2012 21 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
The front end in non-assembled product development: A multiple case study of mineral- and metal firms
موضوعات مرتبط
علوم انسانی و اجتماعی مدیریت، کسب و کار و حسابداری حسابداری
پیش نمایش صفحه اول مقاله
The front end in non-assembled product development: A multiple case study of mineral- and metal firms
چکیده انگلیسی

We conceptualize the front end in non-assembled product development to be iterative and experiment-based, consisting of three sub-phases: informal start-up, formal idea-study, and formal pre-study. Although some key activities are shared with the front end activities in assembled product development, literature reviews, anticipating requirements of customers’ production processes, analysis of raw materials, anticipation of scale-up problems, and tests in bench-, pilot plant-, and full scale production represent unique activities. In addition, product concepts were frequently developed in parallel, requiring specification of physical, chemical and structural properties. These findings have implications for increasing the success and quality of front end efforts.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Engineering and Technology Management - Volume 29, Issue 4, October–December 2012, Pages 468–488
نویسندگان
, , ,