کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1047245 945199 2009 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Least cost principles and electricity planning for Karnataka
کلمات کلیدی
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Least cost principles and electricity planning for Karnataka
چکیده انگلیسی

The state of Karnataka in India faces a shortfall in its electricity-generating capacity, which is higher during peak demand periods. To remedy this, the government has planned a large expansion of baseload capacity, mainly in the form of large coal based thermal power plants. In the study described here, we calculate the per-kilowatt hour costs of various supply side options at different plant load factors, and find that the current plans for supply expansion via large base-load generation plants is at odds with the objective of meeting demand shortfall at lowest cost. We estimate a comparable kilowatt hour cost of energy efficiency measures, and estimate their potential via a sector-wise analysis. A lowest cost planning exercise suggests that the increase in demand over the next decade can be met by implementing energy efficiency measures, expanding renewable sources of power to their capacity, and implementing the thermal power plants already contracted. Therefore it is not necessary to commission any new large coal based thermal plants during the next decade or more.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy for Sustainable Development - Volume 13, Issue 4, December 2009, Pages 225–234
نویسندگان
, ,