کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1060739 947639 2012 9 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Offshore wind decommissioning regulations and workflows in the Outer Continental Shelf United States
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی دریا (اقیانوس)
پیش نمایش صفحه اول مقاله
Offshore wind decommissioning regulations and workflows in the Outer Continental Shelf United States
چکیده انگلیسی

Decommissioning regulations for offshore renewable energy facilities require that all facilities be removed and the seafloor cleared of all obstructions at the end of the life of the lease. The purpose of this paper is to provide an overview of the expected workflows and stages of decommissioning that are likely to arise for offshore wind farms, to describe the exposure and liability of the parties involved and to compare offshore wind and oil and gas decommissioning. An alternative method for turbine removal is proposed which, if feasible, will reduce decommissioning cost. The objectives of a bonding program are motivated and discussed.


► We describe the regulations for decommissioning offshore wind facilities in the U.S.
► Expected methods for decommissioning are described and an alternative proposed.
► Policy implication of government exposures are discussed.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Marine Policy - Volume 36, Issue 1, January 2012, Pages 113–121
نویسندگان
, ,