کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
10997965 1363236 2016 17 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Construction aerodynamics of cable-stayed bridges for record spans: Stonecutters Bridge
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Construction aerodynamics of cable-stayed bridges for record spans: Stonecutters Bridge
چکیده انگلیسی
This paper presents the extensive aerodynamic investigations conducted for the construction of the 1018 m-main span Stonecutters Bridge. The emphasis is on the behaviour of the bridge structure during the erection stages, notably its response to vortex shedding, buffeting and divergent amplitude effects. A description is given of the principal aspects of the wind tunnel testing carried out, including section model testing, aeroelastic freestanding tower model testing on different erection heights, and aeroelastic bridge model testing to investigate the bridge erection stages. The engineering implications of the results are discussed. Wind tunnel testing on stay cables has also been carried out, with special reference to determining cable drag and the susceptibility to rain-wind induced oscillations. These investigations advanced general understanding of the behaviour of cable-stayed bridges during construction, and contributed significantly to the development of the erection method and sequence for the Stonecutters Bridge leading to the expeditious completion of this work.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Structures - Volume 8, Part 1, November 2016, Pages 94-110
نویسندگان
, ,