کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1132351 955773 2012 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Track maintenance production team scheduling in railroad networks
موضوعات مرتبط
علوم انسانی و اجتماعی علوم تصمیم گیری علوم مدیریت و مطالعات اجرایی
پیش نمایش صفحه اول مقاله
Track maintenance production team scheduling in railroad networks
چکیده انگلیسی

US railroad companies spend billions of dollars every year on track maintenance in order to ensure safety and operational efficiency. Optimizing the production team (i.e., large maintenance team) schedule is a very complex problem with major cost implications. In current practice, the decision making process for production team scheduling is largely manual and primarily relies on the knowledge and judgment of experts. This paper addressed the production team scheduling problem by formulating it as a time–space network model with many types of challenging side constraints. Some of these constraints are identified from industry practice and formulated for the first time. Multiple neighborhood search and other enhancement algorithms were proposed to solve the model. The proposed modeling approach has been tested through numerical experiments and also applied to large-scale real-world problem instances, and superior computational performances were found. The proposed approach has been adopted by a Class I railroad to help make annual network maintenance scheduling decisions.


► A time-space network model was formulated for the railroad production team scheduling problem.
► A multi-neighborhood search algorithm with various enhancements was developed to solve the model.
► The proposed approach has been adopted by a Class I railroad company to solve full-scale instances.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Transportation Research Part B: Methodological - Volume 46, Issue 10, December 2012, Pages 1474–1488
نویسندگان
, ,