کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1143975 1489613 2012 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
on reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی کنترل و سیستم های مهندسی
پیش نمایش صفحه اول مقاله
on reasons of uncontrollable construction cost based on the ABC analysis method and the complete decomposition model
چکیده انگلیسی

In view of the previous studies on uncontrollable construction cost, which mostly were based on the practical experiences and subjective speculating, the conclusions were empirical and lack of data support. In order to solve this problem, the quantitative analysis methods are introduced here. The application of ABC analysis method can distinguish the minor-key factors from tremendous factors which influence the cost changes. And the complete decomposition of construction cost changes can decompose the main effects of the cost changes to define the key effects. Through applying these two methods, the construction cost can be controlled by mainly controlling the key factors and effects of the projects. Besides, project data of uncontrollable construction cost can be accumulated to provide objective and scientific suggestions on controlling cost. A completed small civil engineering is presented as an example.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Systems Engineering Procedia - Volume 4, 2012, Pages 359-365