کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1144151 1489616 2011 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Progress Risk Assessment for Spliced Network of Engineering Project Based on Improved PERT
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی کنترل و سیستم های مهندسی
پیش نمایش صفحه اول مقاله
Progress Risk Assessment for Spliced Network of Engineering Project Based on Improved PERT
چکیده انگلیسی

Aimed at the deficiency of the traditional PERT method in the risk assessment for engineering project progress, this paper has improved PERT method, so as to make it more suitable for engineering project risk assessment of spliced network. Firstly, in calculating project activity duration, it adopts response management theory and introduces double-buffering zone, so that the calculated project activity duration is more approximate to the realistic one. Meanwhile, the paper takes advantage of equivalent-weight probability method to revise the main path, so that the calculated project duration is more suitable for the realistic situation. Finally, the paper has further demonstrated the feasibility of the method by an engineering project case study.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Systems Engineering Procedia - Volume 1, 2011, Pages 271-278