کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1144452 | 957412 | 2007 | 7 صفحه PDF | دانلود رایگان |
عنوان انگلیسی مقاله ISI
Study on Resource Scheduling in Project Group Management of Offshore Engineering based on ACO
دانلود مقاله + سفارش ترجمه
دانلود مقاله ISI انگلیسی
رایگان برای ایرانیان
موضوعات مرتبط
مهندسی و علوم پایه
سایر رشته های مهندسی
کنترل و سیستم های مهندسی
پیش نمایش صفحه اول مقاله

چکیده انگلیسی
To solve the problem of resource scheduling in project group management, which is a crying problem in offshore project management, the ant colony optimization (ACO) algorithm was introduced. First, the similarities between resource dynamic scheduling problem and ant's food-seeking were analyzed and the meta-information was defined. Second, the dynamic scheduling model was proposed. Then, engineering practice in offshore project group resource scheduling showed that the resources can be allocated timely, dynamically and rationally by using this algorithm. The method can also be introduced into other related spheres. This study will give rise to project group management.
ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Systems Engineering - Theory & Practice - Volume 27, Issue 7, July 2007, Pages 57-63
Journal: Systems Engineering - Theory & Practice - Volume 27, Issue 7, July 2007, Pages 57-63