کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1510001 1511162 2015 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Life Cycle Assessment of Primary Control Provision by Battery Storage Systems and Fossil Power Plants
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی انرژی (عمومی)
پیش نمایش صفحه اول مقاله
Life Cycle Assessment of Primary Control Provision by Battery Storage Systems and Fossil Power Plants
چکیده انگلیسی

Increasing renewable energy generation influences the reliability of electric power grids. Thus, there is a demand for new technical units providing ancillary grid services. Intermittent renewable energy sources can be balanced by energy storage devices, especially battery storage systems. By battery systems grid efficiency and reliability as well as power quality can be increased. A further characteristic of battery systems is the ability to respond rapidly and precisely to frequency deviations, making them technical ideal candidates for primary control provision (PCP). PCP by battery systems is applied in form of positive (discharge mode) and negative control (charge mode) and can reduce must-run capacity of fossil power plants.In this study environmental impacts of PCP by novelLi-ion large-scale battery energy storage systems (BESSs) are compared to impacts of PCP by state-of-the-art coal power plants (CPPs) using a Life Cycle Assessment (LCA) approach. An inventory of all relevant inputs (resources, material and energy flows) and outputs (emissions, wastes and waste water) is compiled. Environmental impacts associated with these inputs and outputs are evaluated. Finally, PCP by BESSs and fossil power plants are compared in terms of environmental performance. Different scenarios are analyzed by varying sensitive parameters like efficiency loss due to PCP at fossil power plants and required must-run capacity for PCP.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Energy Procedia - Volume 73, June 2015, Pages 69-78