کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
1697412 | 1519254 | 2015 | 14 صفحه PDF | دانلود رایگان |
• We consider a FFL problem with three objectives.
• Two new objectives are presented.
• MOPSO and NSGA-II are proposed to solve the problem.
Mass production, meeting the increasing demands of the customers is a necessity. Such a production is mainly dependent on a factory manufacturing called flow line production. This paper deals with special type of production by the name of flexible manufacturing system, assuming the presence of multi processors in each station of a multi-station arrangement. The model debated in the paper possesses three objective functions, the first of which attempts to minimize the weighted delays. The second objective function tries to minimize the capital for the purchase of the processors at stations and the third objective function minimizes the capital dedicated to select the optimum processing route of parts. For the validation of the mathematical model, use has been made of NSAGAII and MOPSO approaches.
Journal: Journal of Manufacturing Systems - Volume 36, July 2015, Pages 189–202