کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1697494 1519255 2015 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Estimating arrival times of transportation jobs for automated material handling in LCD fabrication facilities
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی کنترل و سیستم های مهندسی
پیش نمایش صفحه اول مقاله
Estimating arrival times of transportation jobs for automated material handling in LCD fabrication facilities
چکیده انگلیسی


• The paper provides a robust approach to estimate arrival times of unit loads.
• Stochastic modeling with heuristic approach is used.
• It is applied for an actual LCD fabrication facility.
• The paper describes a good example of manufacturing system practice.

A modern LCD fabrication facility uses state-of-art automation technology to enhance manufacturing competitiveness driven by shorter cycle times, faster deliveries, and higher quality products. All transportation jobs from a process toolset to other toolsets during fabrication are done by automated material handling systems such as industrial robots, automated cranes, and AGVs (automated guided vehicles) in the industry. Estimating transportation times are important since the information can be used to improve the performance of the material handling systems by providing the expected arrival time of a job compared to its arrival due time, which can be used to change the priority of the transportation more dynamically. This paper develops a new heuristic method based on a stochastic approach to estimate the arrival times of transportation jobs to their final destinations in an LCD fabrication facility. To analyze the performance of the new method, the author collected a set of actual transportation data from the industry and the analysis shows that the new method outperforms an existing method that uses simple statistics based on historical data.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Journal of Manufacturing Systems - Volume 35, April 2015, Pages 112–119
نویسندگان
,