کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1699979 1519326 2015 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Multi-objective Shop Floor Scheduling Using Monitored Energy Data
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Multi-objective Shop Floor Scheduling Using Monitored Energy Data
چکیده انگلیسی

Modern factories will become more and more directly connected to intermittent energy sources like solar systems or wind turbines as part of a smart grid or a self-sufficient supply. However, solar systems or wind turbines are not able to provide a continuous energy supply over a certain time period. In order to enable an effective use of these intermittent energy sources without using temporary energy storages, it is necessary to rapidly and flexibly adapt the energy demand of the factory to the constantly changing requirements of the energy supply. The adaption of the energy demand to the intermittent supply results in different energy-related objectives for the production system of the factory, such as reducing energy consumption, avoiding power peaks, or achieving a power use within the available power supply. Shop Floor Scheduling can help to pursue these objectives within the production system. For this purpose, a solution methodology based on a meta-heuristic will be described for Flexible Job Shop Scheduling taking into account different energy- as well as productivity-related objectives.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia CIRP - Volume 26, 2015, Pages 510-515