کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1700352 1519335 2014 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Grouping and Sequencing of Machining Operations for High Volume Transfer Lines
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی صنعتی و تولید
پیش نمایش صفحه اول مقاله
Grouping and Sequencing of Machining Operations for High Volume Transfer Lines
چکیده انگلیسی

Transfer lines are costly assets used for manufacturing of voluminous quantities of a dedicated discrete product following a pre- defined process plan. This paper deals with the problem of optimal grouping, sequencing and utilization of the dedicated machinery that goes into such transfer lines. A time objective function has been utilized. Handling time, which is an important component of cycle time, is assumed to be comprised of tool change time, time required to reposition and transport the workpiece and refixturing & reloading time. A new mixed integer linear programming model is developed to solve the problem with the aforementioned objectives while respecting a set of constraints, which include machine loading, tool allocation, tool magazine limit, takt time limit and precedence & inclusion constraints. A numerical case study is utilized to illustrate the functionality of the model.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Procedia CIRP - Volume 17, 2014, Pages 76-81