کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1721795 1520432 2013 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Adjusting the financial risk of tidal current projects by optimising the ‘installed capacity/capacity factor’-ratio already during the feasibility stage
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Adjusting the financial risk of tidal current projects by optimising the ‘installed capacity/capacity factor’-ratio already during the feasibility stage
چکیده انگلیسی

One of the key challenges in marine energy is to achieve funding for commercial-scale project implementations. Apart from government regulations and technological risks, the likelihood that projects will be implemented depends on transparent information about the necessary capital investment, the expected profit margins, and the corresponding cost of capital. The paper examines this relationship for tidal current schemes and provides a method to effectively de-risk early-stage project initiatives. The possibility to select a preferred ratio of ‘capital investment’ to ‘profit’ widens the circle of potential investors and accelerates the commercialisation of the sector. Based on fundamental insight gained during an in-depth investigation on the performance characteristics of an envisaged large-scale tidal array in Korea, the conceptual design of new projects can be realised in close coordination with investor-specific risk/reward preferences.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: International Journal of Marine Energy - Volume 2, June 2013, Pages 28–42
نویسندگان
, ,