کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
1741604 1017403 2009 8 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Present status of nuclear containments and ISI in Korea
موضوعات مرتبط
مهندسی و علوم پایه مهندسی انرژی مهندسی انرژی و فناوری های برق
پیش نمایش صفحه اول مقاله
Present status of nuclear containments and ISI in Korea
چکیده انگلیسی

Since the first nuclear power plant started in commercial service in 1978 in Korea, 20 units have been operated and maintained, and most recently several units were under construction and planned to be constructed in order to meet the demand of more electricity. The importance of nuclear containments always has been one of the hottest issues for the safety and protection of nuclear power plants. From 1970s to present year, various types of nuclear containments have been constructed until now. With the changes of times, nuclear containment systems have undergone a remarkable change, and finally a Korea standard nuclear power plant was defined. For those reasons, various regulatory issues, inspection technologies, technical requirements for periodic inspection have been applied differently depending on the specific nuclear containment types. In this study, overall status of nuclear power plants, development stages of nuclear containment systems, and inservice inspections in Korea were researched.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Progress in Nuclear Energy - Volume 51, Issue 8, November 2009, Pages 761–768
نویسندگان
, ,