• Financial risk associated with over or underproduction of electricity is studied.
• A two-stage stochastic model that considers parameter uncertainties is developed.
• The model was applied to a real case to meet projected electricity demand of a fleet of generating stations.
• Incorporation of financial risk resulted in an increase in electricity cost.
• The selection of technologies was the same as that obtained from a deterministic model.
This paper proposes a new methodology to include financial risk management in the framework of two-stage stochastic programming for energy planning under uncertainties in demand and fuel price. A deterministic mixed integer linear programming formulation is extended to a two-stage stochastic programming model in order to take into account random parameters that have discrete and finite probabilistic distributions. This was applied to a case study focusing on planning the capacity supply to meet the projected electricity demand for the fleet of electricity generation stations owned and operated by Ontario Power Generation (OPG). The objective of the proposed mathematical model is to minimize cost subject to environmental constraints. The case study is investigated by considering only existing technologies and also by considering the integration of new technologies that help achieve stricter carbon reduction requirements.
Journal: Applied Energy - Volume 128, 1 September 2014, Pages 75–81