کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
245621 1428240 2012 12 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Risk evaluation of tunneling projects
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Risk evaluation of tunneling projects
چکیده انگلیسی

Tunneling industry has seen great advancements in underground construction projects. Now, it has significant difference with the last two decades. In many times, tunneling projects find themselves involved in the situation where unexpected conditions threaten the continuation of project. Managers always look for a reliable technique to overcome limitations of finance and time. TOPSIS method is widely used to solve multi criteria decision making (MADM) problems. This technique assigns the best alternative among a pool of feasible alternatives. Furthermore, due to inherent uncertainties in tunneling, using fuzzy logic in order to take into account these uncertainties can be useful. In addition, new factors are introduced to promote the accuracy of risk analysis. Finally, a real world case study is presented to show the effectiveness and the accuracy of the new risk evaluation model. The results demonstrated that collapse is the riskiest parameter in Ghomroud water conveyance tunneling project.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Archives of Civil and Mechanical Engineering - Volume 12, Issue 1, March 2012, Pages 1–12
نویسندگان
, , ,