کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
246806 502389 2013 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Optimal utilization of interior building spaces for material procurement and storage in congested construction sites
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Optimal utilization of interior building spaces for material procurement and storage in congested construction sites
چکیده انگلیسی

Congested construction sites, such as urban building projects, often have insufficient exterior space to accommodate all needed temporary facilities and material storage areas. Accordingly, interior building spaces need to be used for material storage while exterior space is left for temporary site facilities. Existing models of site layout and material logistics, however, do not support the utilization of interior spaces due to the complexity of interior space modeling. This paper presents the development of a new congested construction logistics planning (C2LP) model that is capable of modeling and utilizing interior spaces of buildings under construction to generate optimal logistics plans. The proposed C2LP model includes novel computational algorithms to model interior space allocation, complex space constraints, and impact of interior space utilization on activity scheduling. C2LP considers four types of decision variables, material procurement, material storage, facility layout, and scheduling of noncritical activities. The model is implemented by using multi-objective genetic algorithms to generate optimal logistics plans that provide optimal tradeoffs between minimizing total logistics costs and minimizing schedule criticality. The model is evaluated by using an application example to illustrate its capabilities in utilizing interior building space in the logistics plan of congested construction projects.


► Allocation of interior spaces to material storage and activities is modeled.
► Four groups of logistics decision variables are identified and formulated.
► Two objectives are identified for planning congested construction logistics.
► The model is implemented using multi-objective genetic algorithms.
► Complex interior space constraints and dynamics of material handling are modeled.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 31, May 2013, Pages 292–306
نویسندگان
, ,