Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Time/cost optimization using hybrid evolutionary algorithm in construction project scheduling
چکیده انگلیسی

This paper deals with construction project scheduling. In the literature on the subject one can find such scheduling methods as: the Linear Scheduling Model (LSM), Line of Balance (LOB) charts and CMP/PERT network planning. The methods take into account several objective functions: the least cost, the least time, limited resources, work priorities, etc., both in the deterministic and probabilistic approach. The paper presents an analysis of the time/cost relationship, performed using time coupling method TCM III. A modified hybrid evolutionary algorithm (HEA) developed by Bożejko and Wodecki (A Hybrid Evolutionary Algorithm for Some Discrete Optimization Problems. IEEE Computer Society, 325–331, 2005) was used for optimization.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 18, Issue 1, December 2008, Pages 24–31
نویسندگان
, , ,