کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
247624 502438 2006 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Construction management process reengineering: Organizational human resource planning for multiple projects
موضوعات مرتبط
مهندسی و علوم پایه سایر رشته های مهندسی مهندسی عمران و سازه
پیش نمایش صفحه اول مقاله
Construction management process reengineering: Organizational human resource planning for multiple projects
چکیده انگلیسی

Applying the business process reengineering and organization planning philosophy, this study focuses on human resource planning in construction management process reengineering (CMPR) to develop a team-based human resource planning (THRP) method for deploying laborpower. The THRP method has two purposes; the first is to determine the maximum loading of projects the original laborpower can carry, and the second is to identify the range of laborpower required for expected project loadings in the future. The THRP method includes four phases, namely, process reengineering, data preparing, human resource allocation, and simulation. Using the THRP method, a construction company cannot only design a team-based organizational structure, but also allocate human resources based on cross-functional processes. Moreover, human resource utilizations before and after CMPR can be compared to evaluate savings attributable to the CMPR. As a consequence, optimum laborpower can be assessed, and human resources allocated to fit the changing processes and circumstances of a construction company's growing business.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Automation in Construction - Volume 15, Issue 6, November 2006, Pages 785–799
نویسندگان
, , ,