کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
427838 | 686565 | 2011 | 5 صفحه PDF | دانلود رایگان |

This paper addresses the total completion time minimization in a two-stage differentiation flowshop where the sequences of jobs per type are predetermined. The two-stage differentiation flowshop consists of a stage-1 common machine and m stage-2 parallel dedicated machines. The goal is to determine an optimal interleaved processing sequence of all jobs at the first stage. We propose an O(m2∏k=1mnkm+1) dynamic programming algorithm, where nknk is the number of type-k jobs. The running time is polynomial when m is constant.
Research highlights
► We address the total completion time minimization in a two-stage differentiation flowshop where the sequences of jobs per type are predetermined.
► Deriving optimal schedules from given job sequence is not necessarily trivial.
► We propose an O(m2∏k=1mnkm+1) dynamic programming algorithm, where nknk is the number of type-k jobs.
► The running time is polynomial when m is constant.
Journal: Information Processing Letters - Volume 111, Issue 5, 1 February 2011, Pages 208–212