کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
4652582 1632594 2011 6 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Robust Planning for an Open-Pit Mining Problem under Ore-Grade Uncertainty
موضوعات مرتبط
مهندسی و علوم پایه ریاضیات ریاضیات گسسته و ترکیبات
پیش نمایش صفحه اول مقاله
Robust Planning for an Open-Pit Mining Problem under Ore-Grade Uncertainty
چکیده انگلیسی

Open-pit mining production planning is a risky problem: operation costs are considerable, many parameters are inherently subject to uncertainty and, moreover, the mining operation can only be done once. In this work we address uncertainty in the ore-grade, where we only assume the availability of an i.i.d. sample of the joint distribution of ore-grade in the blocks of the mining site. We consider an open-pit mining problem involving extraction and processing decisions under capacity constraints. We apply and compare the risk-hedging performance of three approaches for optimization under uncertainty: Value-at-Risk, Conditional Value-at-Risk and a proposed robust optimization approach. The latter is shown to have desirable risk-averse properties. Computational results on one small size vein-type mine are shown.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Electronic Notes in Discrete Mathematics - Volume 37, 1 August 2011, Pages 15-20