کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
473943 698825 2009 13 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Scheduling of a single crane in batch annealing process
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Scheduling of a single crane in batch annealing process
چکیده انگلیسی

This paper studies a single crane scheduling problem motivated by batch annealing process in the iron and steel industry. Each coil stack placed on fixed base needs to go through two-stage processing: heating and cooling. During each stage, limited special machines (furnace and cooler) must be operated by crane, respectively. Our problem is to assign the shared machines and schedule a single crane for minimizing the last coil stack completion time (makespan). A mixed integer linear programming (MILP) model is formulated by considering both machine and crane positions. We show that the problem is NP-hard in the strong sense. Some optimal properties on the problem are derived. A two-phase algorithm is constructed for the problem. In the first phase, a fully polynomial time approximation scheme (FPTAS) is developed for the assignment subproblem. In the second phase, a heuristics is proposed for the scheduling subproblem. From an absolute performance point of view, we analyze the quality of the two-phase algorithm. We also consider special cases where some properties or algorithms are developed. In order to further verify the performance of the two-phase algorithm, we develop a lower bound on the optimal objective function. Computational experiments on the randomly generated problem instances show that the algorithm is close to the lower bound within a reasonable computation time.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Operations Research - Volume 36, Issue 10, October 2009, Pages 2853–2865
نویسندگان
, , ,