کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
474818 | 699146 | 2009 | 11 صفحه PDF | دانلود رایگان |
![عکس صفحه اول مقاله: Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system Minimizing earliness and tardiness subject to total completion time in an identical parallel machine system](/preview/png/474818.png)
This study addresses the identical parallel machine scheduling problem in which the total earliness and tardiness about a common due date are minimized subject to minimum total flowtime, P∥(E+T)/∑CiP∥(E+T)/∑Ci. The problem is demonstrated to be transformed into a simplified version of the parallel machine problem with the objective of minimizing makespan subject to minimum total flowtime, P∥Cmax/∑CiP∥Cmax/∑Ci. Several properties are considered to solve optimally the restricted version of the problem. A streamlined binary integer programming model is developed to solve the P∥Cmax/∑CiP∥Cmax/∑Ci problem and the P∥(E+T)/∑CiP∥(E+T)/∑Ci problem. Computational experiments indicate that the binary integer programming model is superior to the existing optimization algorithm for the P∥Cmax/∑CiP∥Cmax/∑Ci problem in the literature.
Journal: Computers & Operations Research - Volume 36, Issue 2, February 2009, Pages 461–471