کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
475189 699235 2013 15 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Tabu search and lower bounds for a combined production–transportation problem
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Tabu search and lower bounds for a combined production–transportation problem
چکیده انگلیسی

In this paper we consider a combined production–transportation problem, where n jobs have to be processed on a single machine at a production site before they are delivered to a customer. At the production stage, for each job a release date is given; at the transportation stage, job delivery should be completed not later than a given due date. The transportation is done by m identical vehicles with limited capacity. It takes a constant time to deliver a batch of jobs to the customer. The objective is to find a feasible schedule minimizing the maximum lateness.After formulating the considered problem as a mixed integer linear program, we propose different methods to calculate lower bounds. Then we describe a tabu search algorithm which enumerates promising partial solutions for the production stage. Each partial solution is complemented with an optimal transportation schedule (calculated in polynomial time) achieving a coordinated solution to the combined production–transportation problem. Finally, we present results of computational experiments on randomly generated data.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Operations Research - Volume 40, Issue 3, March 2013, Pages 886–900
نویسندگان
, , , ,