کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
476068 699413 2011 10 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Time-constrained project scheduling with adjacent resources
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Time-constrained project scheduling with adjacent resources
چکیده انگلیسی

We develop a decomposition method for the Time-Constrained Project Scheduling Problem (TCPSP) with adjacent resources. For adjacent resources the resource units are ordered and the units assigned to a job have to be adjacent. On top of that, adjacent resources are not required by single jobs, but by job groups. As soon as a job of such a group starts, the adjacent resource units are occupied, and they are not released before all jobs of that group are completed. The developed decomposition method separates the adjacent resource assignment from the rest of the scheduling problem. Test results demonstrate the applicability of the decomposition method. The presented decomposition forms a first promising approach for the TCPSP with adjacent resources and may form a good basis to develop more elaborated methods.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: Computers & Operations Research - Volume 38, Issue 1, January 2011, Pages 310–319
نویسندگان
, , , ,