کد مقاله | کد نشریه | سال انتشار | مقاله انگلیسی | نسخه تمام متن |
---|---|---|---|---|
477082 | 1446108 | 2011 | 12 صفحه PDF | دانلود رایگان |

A pharmaceutical company raised the question whether an increased product portfolio could still be manufactured on the existing machinery. The proportional lot-sizing and scheduling problem (PLSP) seemed to be most appropriate to answer this question. However, although there are papers dealing with a multi-level PLSP none allows a zero lead time offset which is a prerequisite for the case considered here.In this paper we will extend and modify an existing mixed integer linear programming (MIP) model formulation in two ways: first, we will extend the single-level single machine PLSP to a multi-level single machine PLSP (PLSP-ML-SM) with a zero lead time offset. Second, we will describe a new and more compact model formulation incorporating period overlapping setup times and batch size constraints. Based on the real-world application several test instances have been generated to provide insights into those characteristics which make instances of the PLSP-ML-SM difficult to solve by a standard MIP solver.
Journal: European Journal of Operational Research - Volume 209, Issue 3, 16 March 2011, Pages 241–252