کد مقاله کد نشریه سال انتشار مقاله انگلیسی نسخه تمام متن
477090 1446117 2010 7 صفحه PDF دانلود رایگان
عنوان انگلیسی مقاله ISI
Scheduling problems with two competing agents to minimize minmax and minsum earliness measures
موضوعات مرتبط
مهندسی و علوم پایه مهندسی کامپیوتر علوم کامپیوتر (عمومی)
پیش نمایش صفحه اول مقاله
Scheduling problems with two competing agents to minimize minmax and minsum earliness measures
چکیده انگلیسی

A relatively new class of scheduling problems consists of multiple agents who compete on the use of a common processor. We focus in this paper on a two-agent setting. Each of the agents has a set of jobs to be processed on the same processor, and each of the agents wants to minimize a measure which depends on the completion times of its own jobs. The goal is to schedule the jobs such that the combined schedule performs well with respect to the measures of both agents. We consider measures of minmax and minsum earliness. Specifically, we focus on minimizing maximum earliness cost or total (weighted) earliness cost of one agent, subject to an upper bound on the maximum earliness cost of the other agent. We introduce a polynomial-time solution for the minmax problem, and prove NP-hardness for the weighted minsum case. The unweighted minsum problem is shown to have a polynomial-time solution.

ناشر
Database: Elsevier - ScienceDirect (ساینس دایرکت)
Journal: European Journal of Operational Research - Volume 206, Issue 3, 1 November 2010, Pages 540–546
نویسندگان
, ,